01 / CHECK
Inspect the part
Measure agreed features with CMM and the methods specified for the project.
BLESS / QUALITY
BLESS uses CMM, spectrometry, tensile testing and NDT. Material, dimensional and mechanical-property reports can accompany the order, with the inspection scope confirmed per project.
Start with the drawing and acceptance requirements, then confirm the inspection methods and records that apply.
| Inspection method | Role in the project |
|---|---|
| CMM | Dimensional and geometric checks against the agreed drawing |
| Spectrometer | Material composition analysis for the specified aluminum alloy |
| Tensile testing | Mechanical-property testing to the agreed scope |
| NDT | Inspection requirements and acceptance criteria confirmed per project |
Material, dimensional and mechanical-property reports can be provided with the goods. The specific records, features and acceptance criteria should be agreed before production.
BLESS uses CMM, spectrometry, tensile testing and NDT. The drawing and agreed acceptance criteria define the inspection scope.
01 / CHECK
Measure agreed features with CMM and the methods specified for the project.
02 / RECORD
Material, dimensional and mechanical-property reports can accompany the order.
03 / PROTECT
Discuss packaging and handling requirements for the finished components.
04 / RELEASE
Confirm destination, packaging, requested records and project-specific timing.
State the alloy designation and applicable standard if your design already specifies them. List critical dimensions, surface conditions and the checks or records you require. Material availability, manufacturing suitability and the inspection scope need to be confirmed for the individual project.
Clarify the drawing revision, quantities, sample approval requirements, inspection records, packaging and requested delivery destination. Ask for project-specific confirmation of commercial terms and timing. A requested delivery date should not be treated as a confirmed lead time.
Tell us what the part must do. A clear first reply should explain what we can confirm, and what we still need from you.